Company Slogan

Serve the public and your challenge is our progress

Tuesday 31 May 2011

Past Project


Project Title: Ampang Puteri Specialist Hospital

Client:  KPJ Healthcare Berhad
Location : Ampang Point
Project Cost: RM150 million   
Completion: November 2007 







Indah Point Interchange at Pulau Indah, Selangor, Malaysia.

Client: Wijaya Sdn Bhd
Project Description: Design of the 1700m long bridge with ground treatment for approach embankments to the two ramps at Indah Point
Completion: early 2005


Approach Embankment to Bridge across PLUS Expressway at Bernam Jaya

Client: Syarikat Muhibbah Perniagaan & Pembinaan Sdn Bhd
Project Description: Design of alternative foundation system for the bridge approach embankment. The alternative foundation system proposed is pile embankment with variable Pile length (transition piles) together with temporary surcharge. This alternative system prevents differential settlement between the bridge and approach embankment which is common problem on the bridge approaches
Completion : 2008

Slope Rehabilitation Works at KM 32.6 SB Linkedua Expressway near Senai, Johor

Client: Linkedua Expressway Bhd
Project Description: Design of the rehabilitation measures to remedy the 2-berm slope with improvement of the surface and sub-surface drainage system
Completion: early 2010

Taman Bukit Minyak Indah

Client: Usaha Maju Sdn. Bhd.
Completion:2010  
Location: Kuala Lumpur 
Type: Terrace  
Tenure: Freehold

The Meritz

Completion:2008   
Location: Kuala Lumpur   
Type: High Rise Residence   
Tenure: Freehold




Putrajaya Wetland & Lake Development

Client: Putrajaya Holding Sdn. Bhd
Location: Putrajaya
Project Cost: RM90 million
Completion: November 2004



Project Title: Taman Tasik Universiti Teknologi Petronas

Client: University Technology Petronas
Location : Tronoh, Perak Darul Ridzuan
Project Cost : RM50 million
Completion  : May 2007









No comments:

Post a Comment